PENGGUNAAN ALGORITMA METAHEURISTIK UNTUK OPTIMASI FINANCE BASED SCHEDULING
Abstract
Keywords
Full Text:
PDFReferences
A. Elazouni and A. Gab-Allah, "Finance-based scheduling of construction projects using integer programming," Journal of Construction Engineering and Management, vol. 130, no. 1, pp. 15-24, 2004.
M. El-Abbasy, A. Elazouni and T. Zayed, "Finance-based scheduling multi-objective optimization: benchmarking of evolutionary algortihms," Automation in Construction, vol. 120, no. 103392, pp. 1-16, 2020.
M. M. Ali and A. Elazouni, "Financeābased CPM/LOB scheduling of projects with repetitive non-serial activities," Construction Management and Economics, pp. 839-856, 2009.
A. Elazouni and F. G. Metwally, "Finance-based scheduling: tool to maximize project profit using improved genetic algorithms," Journal of Construction Engineering and Management, vol. 131, no. 4, pp. 400-412, 2005.
A. E. Ezugwu and D. Prayogo, "Symbiotic organisms search algorithm : theory, recent advances and applications," Expert Systems with Applictions, vol. 119, pp. 184-209, 2018.
S.-S. Leu, C.-H. Yang and J.-C. Huang, "Resource leveling in construction by genetic algorithm-based optimization and its decision support system application," Automation in Construction, vol. 10, no. 1, pp. 27-41, 2000.
T. Ng and Y. Zhang, "Optimizing construction time and cost using ant colony optimization approach," Journal of Construction Engineering and Management, vol. 134, no. 9, pp. 721-728, 2008.
Z. Abdmouleh, A. Gastli, L. Ben-Brahim, M. Haouari and N. A. Al-Emadi, "Review of optimization techniques applied for the integration of distributed generation from renewable energy sources," Renewable Energy, vol. 113, pp. 266-280, 2017.
A. Afshar and H. Fathi, "Fuzzy multi-objective optimization of finance based scheduling for construction projects with uncertainties in cost," Engineering Optimization, vol. 41, no. 11, pp. 1063-1080, 2009.
H. Fathi and A. Afshar, "GA-based multi-objective optimization of finance-based construction project scheduling," KSCE Journal of Civil Engineering, vol. 14, pp. 627-638, 2010.
J. Kennedy and R. Eberhart, "Particle swarm optimization," in International Conference on Neural Networks, Perth, 1995.
M. Ho and R. Gozal, "Optimasi multi-objektif permasalahan time-cost-quality trade-off pada proyek SOHO X dengan metode metaheuristik," Universitas Kristen Petra, Surabaya, 2018.
DOI: http://dx.doi.org/10.53712/rjrs.v8i2.2229
Refbacks
- There are currently no refbacks.
Rekayasa: Jurnal Teknik Sipil is indexed by: